Data Centre – CWL11.2
CARDIFF - UK
The campus, designed and built to exceed Tier III standards, will feature 2,000,000 gross square feet (186,000 gross square meters) with density per rack ranging from 2kW to 125kW+. CWL1 is considered to be one of Europe’s largest data centre campuses to meet customer demand from around the world.
GMES Ltd were engaged by Bouygues to provide LVAP, Electrical Inspection, Testing and documentation services on the LV installation. This included the Torqueing of all connections for main and sub-main cables, inspection and testing of the LV Bus Bar systems, verification of construction issue drawings and distribution board charts and verification of the Earthing and Bonding systems.
As part of our services GMES Ltd produced and managed progress reports, inspection reports detailing departures from BS7671 and a tracker to collate the key facts from both reports.
Main Client:
Confidential
GMES Client:
Bouygues E&S UK Ltd
Value to GMES:
£350K
Dates:
June 2024 to May 2025
Key Facts:
- Sector – Data Centre
- Territory – Cardiff, United Kingdom
- Commenced Site Works – 01/06/2024
- Services Supplied – Electrical I&T, LVAP LOTO Management
- Completed Site Works – 29/05/2025